Run the supply and drain lines and install their required supports while the framing is open. Set a flanged alcove tub before finishing its walls. Once the floor is ready, set the floor mounted toilet and any freestanding bath that rests on the finish. Leave room to carry the largest piece into position before setting the vanity or hanging glass in its path. You can choose the faucets and lay out the accessories while the room is open. Their visible parts can wait.
If a fixture leaks into the floor or wall, stop using it. Skip any fill or flush test and have the leak assessed before covering the area. Before a supply is disconnected, have the water isolated and verify it is off. If a shutoff sticks, leaks or fails to stop the water, leave the fitting connected and have a plumber isolate it safely. In a shared building, arrange the shutdown with the person responsible for the supply.
Take the actual tub, drain, valve and trim model numbers to the plumber. The rough plumbing is the pipework and valve bodies that stay inside the floor or wall. A drawing that measures valve depth from the face of the finished tile needs the thickness of the board, waterproofing and tile accounted for. Have the plumber and tile installer agree where that face will be. If the chosen tile changes, check the valve depth again while it can still be moved.
Ask the plumber to mark the drain center, the floor height the connection is measured from and any access the installer will need later. Have the installer locate backing for fixtures, grab bars and glass from the instructions for the intended hardware. Choose the shower controls now so the plumber can match the hidden valve. Leave the handle and faceplate in their box until the wall finish is ready. For a remodel that requires inspection, ask the local building department which work must remain visible. For example, Milpitas, California schedules rough plumbing with other rough trades and separately describes a shower receptor test. Agree on the required tests and inspections before booking the crew that will cover the work.
Find the drawing where the tub meets the building. Delta's Classic 500 right drain 60 by 32 inch alcove tub, model B23605 6032R WH, fastens to exposed studs through its flanges. Its installation sheet 113866 shows the tub secured before the tiled surround is finished. On that tiled version, the wall installer needs the rim in place to finish the joint. After the tile is in, Delta calls for sealant at the outer edges and where tub and finished wall meet. Wait for the specified cure before use. With Delta's matching wall set, turn to the panel instructions instead. Those panels need extra studs in positions you establish before the tub goes in.
Kohler's Abrazo K 1800 freestanding bath goes on an adequately supported, level finished floor. That puts the tile under the tub on the earlier crew's list. Leave clearance for the movers, have the plumber prepare the correct drain and have the installer confirm the floor can take the tub. Kohler calls for sufficient help and lifting straps. Have the crew check the doorway and the turn inside the room before another fixture narrows either one. A tape measurement straight across the doorway misses the turn past a vanity.
If the plumber has paperwork from an older Abrazo, compare it with the drain in the carton. Kohler's earlier K 1800 guide specified a drain pipe projecting 2 1/8 inches above the finished floor. Its guide 1420044, revision C, starts by identifying which of two drain assemblies came with the bath. Another guide linked for the model directs the installer to the instructions supplied with the drain. Give the plumber the actual drain, its instructions and the finished floor height before any final pipe cut. A number from a previous bathroom can be quite precise and still belong to a different connection.
The freestanding faucet has a schedule of its own. On Home And Tower's S164 chrome floor mounted tub filler, the chrome option photo shows the column and the plate that conceals its base. A separate parts photo shows the floor box. The listing omits the inlet thread size and the installation depth. It also describes a swivel spout, while the photos show it in one position. If the tap only reaches the bowl in your layout when the spout is turned, leave that floor location uncommitted. Get the seller's connection, orientation and depth details for the actual box before the floor closes. The visible column can wait until the bath is in place if the matched instructions allow it.
1. Keep the delivery route open. Lay out the route on the floor. Suppose the crew can make the turn into the tub alcove while the wall opposite is empty. Once a vanity sits there, the crew would have to lift the tub across the cabinet. Have them bring the tub through first. If the vanity arrives in two pieces, keep the cabinet and its top apart until the installer has decided how to reach the faucet mounting nut. Kohler's faucet and drain sheet 1554351, for example, recommends fitting both to the sink before installing the sink when possible. Follow the sink and countertop instructions as well. Keep the cabinet drawers out long enough for the plumber to connect and inspect the trap and supply fittings.
2. Decide when the toilet can come back. Its floor must be ready and its mounting flange sound, secure and at the right height for the finished surface. Oatey's guide for a solvent welded flange permits it to sit flush with or on top of the finished floor. For its three options to repair a broken cast iron flange, Oatey specifies that the bottom of the repair flange sits on top of the finish and fastens into the subfloor. A ring left low by new tile, a broken flange or a soft floor needs assessment before the bowl goes down. While the bowl is out, have the open drain sealed with a proper temporary cover. Where the toilet is clear of the tub's travel path and the work at the vanity, the plumber can return it to service as soon as its own installation and checks are complete. In a home with one bathroom, that difference is worth settling with the crew before demolition.
Decide where the glass will attach before closing the walls, then confirm the size after the finished surfaces are in. DreamLine's measuring guide takes widths at the top, middle and bottom of the finished shower opening and checks the walls for plumb. Put the measuring visit and the installation visit on separate lines of the schedule. While the glass is being prepared, the crew can bring in the bath or cabinet and finish the work that needs unrestricted access. Leave another line for the first shower. DreamLine's Avenue instructions call for 24 hours after the final silicone application before shower use and also require following the sealant maker's directions. If that installation finishes at four on Friday, Friday night is too soon for a shower. If the silicone needs longer under the room conditions, use the later time.
Have the installer fit the remaining trim, mirror and accessories once the finished locations, support and tool access are clear. Note when each sealant or adhesive can get wet or carry a load. Before taking the bathroom back, have the plumber demonstrate each completed fixture separately, including its drain, with the connections still accessible. Stop at the first sign of leakage. If the floor or ceiling below gets wet, keep that fixture off until the source and any damage are addressed. For the measurements to bring to the trades, use the bathroom update planning guide. For an enclosure that is ready for glass, see where to take each finished opening measurement.
White Rectangular Ceramic Vessel Sink with Black Single Handle Waterfall Faucet 20 InchCHF 393.00
Flower and Bird Petal Shaped Ceramic Vessel Sink with Antique Brass Single Handle FaucetCHF 407.00
Gold Floral Rectangular Ceramic Countertop Sink with Single Handle FaucetFrom CHF 671.00
Brown Tempered Glass Round Vessel Sink with Single Handle Faucet and Pop Up Drain, 16.5 InchFrom CHF 520.00
Matte Black Oval Vessel Sink with Stone Look Exterior and Single Handle Black FaucetCHF 884.00
Ribbed Clear Glass Round Vessel Sink with Gold Rim and Single Handle Gold FaucetCHF 703.00
Goldfish Pattern Clear Glass Round Vessel Sink with Single Handle Waterfall FaucetCHF 359.00
Polished Gold Oval Ceramic Vessel Sink with Gold Single Handle Faucet in Two Styles 16 InchFrom CHF 375.00
Single Handle Single Hole Bathroom Faucet with Digital Temperature Display and LED Light in Four Finishes 6.4 Inch TallFrom CHF 203.00
Marble Look or White Rectangular Ceramic Vessel Sink with Single Handle Waterfall Faucet 16 or 19 InchCHF 427.00
Gray Tempered Glass Boat Shaped Vessel Sink with Single Handle Waterfall FaucetCHF 405.00
Gold Round Ceramic Vessel Sink with Gold Single Handle Waterfall Faucet in Three Styles 15 InchFrom CHF 418.00